+1(407) 514-2628
Fossil New Construction

Lakeside II
Siemens Energy
Lake Side Power Station is a natural gas turbine power station at Vineyard, Utah, United States. It was built by Lake Side Power LLC. with Siemens Westinghouse Power Corporation and is operated by PacifiCorp which does business in Utah as Rocky Mountain Power. The station was completed in 2007 and has a daily average production of 545 megawatts of electricity. Twenty-two of the 70-acre (28 ha) site on which the plant is built were part the site of the Geneva Steel steel mill and meets government pollution regulatory requirements with emission offset credits purchased from Geneva Steel. The plant and its steam plume are usually visible from Interstate 15 between the Orem/Lindon and Pleasant Grove exits near the northeastern corner of Utah Lake.

Longview
Siemens Energy
Longview Power Plant is a coal-fired power plant located near Maidsville, West Virginia. The plant's single unit generates 700 megawatt (MW) of electricity from run-of-mine coal and natural gas.

Lordstown
Siemens Energy
Lordstown Energy Center is a 940MW combined-cycle power plant (CCGT) located 80km southeast of Cleveland in the village of Lordstown, Ohio, US. The main developer of the project is Clean Energy Future. The Ohio Power Sitting Board approved the $853m project in September 2015.